Since the roof of LCC1 has had the canvas replaced (see our Blog of September 15th 2016) the Workshop team have fitted the moulding edges and added the bearers for the trolley planks to the roof.
The window frames have been dry fitted, and once they are permanently in place, the roof will be lifted onto the body.
We will report further advances as work develops.